EXCELLENCE IN ENGINEERING CONSULTING 

STATIONS & TERMINALS

FINAL DESIGN OF THE STABLING BUILDING AND THE EMU FOOTBRIDGE  AND PREPARATION OF TENDER DOCUMENTS FOR ALL BUILDINGS IN THE NEW STATION OF AGIOS IOANNIS RENDI (AIP) (CA 396).
Project’s Owner:  ERGA OSE S.A.

ADDITIONAL ELECTRICAL AND MECHANICAL STUDIES TO SERVE THE NEEDS OF ATHENS 2004 IN BUILDING 1, AT THE PREMISES OF OSE IN  THRIASSIO.
Project Owner: ATHENS 2004 SA

ADDITIONAL ELECTRICAL AND MECHANICAL STUDIES TO SERVE THE NEEDS OF THE ATHENS 2004 IN BUILDING  2, AT THE PREMISES OF OSE IN  THRIASSIO.
Project Owner: ATHENS 2004 SA

NEW RAILWAY STATION AT AG. IOANNIS RENDIS  FINAL E/M STUDY.
Project’s Owner:  ERGA OSE S.A.

PRELIMINARY DESIGN AND FINAL DESIGN OF THE NEW RAILWAY STATION IN THRIASSIO PEDION.
Project’s Owner:  ERGA OSE S.A.

BUILDINGS AND PLANT MACHINERY AT OSE KALAMATA. FINAL DESIGN OF ELECTROMECHANICAL INSTALLATIONS. DETAILED DESIGN.
Project’s Owner:  OSE SA

STUDY OF METAL ROOF AND LOAD BEARING ELEMENTS AND DESIGN OF THE EQUIPMENT OF THE BUILDINGFOR THE MAINTENANCE AT REDI DMU, DEPOT.
Project’s Owner: ERGOSE SA

BUILDINGS FOR THE MAINTENANCE OF RAILWAY ROLLING STOCK AT THRIASSIO (TEMPORARY USE: WAREHOUSE CO. O. A. ATHENS 2004).
Project’s Owner:  OSE SA

ADAPTATION OF MAROUSSI AND PERISSOS RAILWAY STATIONS FOR HANDICAPPED PEOPLE.
Project’s Owner: ISAP SA

ADAPTATION OF ANO PATISSIA AND AG.ELEGFTHERIOS RAILWAY STATIONS FOR HANDICAPPED PEOPLE.
Project’s Owner: ISAP SA

BUS STATION (KTEL) AT LAMIA
FINAL E/M STUDY
Project’s Owner:  KTEL OF LAMIA

BUS REPAIR AND MAINTENANCE WORKSHOP (WITHIN THE DEPOT)  IN PHINIKAS AREA - THESSALONIKI.
Project’s Owner:  OASTH

BUS REPAIR AND MAINTENANCE WORKSHOP (WITHIN THE DEPOT)  IN STAVROUPOLI, AREA-THESSALONIKI.
Project’s Owner:  OASTH


TRANSPORT

ROAD & RAIL TUNNELS

DETAILED STUDY OF ELECTROMECHANICAL INSTALLATIONS IN THE TUNNEL OF THE NEW DOUBLE RAILWAY LINE ATHENS - CORINTH FROM KM sta 21 +299.88 TO 22+ 299.88.
Project’s Owner: OSE SA

DETAILED STUDY OF ELECTROMECHANICAL INSTALLATIONS IN THE RAILWAY TUNNEL OF  MAVRI ORA.
Project’s Owner: OSE SA 

High way Road Tripoli-Kalamata motorway, Construction of  Tunnel “RAPSOMATI”
Project’s Owner: Ministry of Public Works


HIGH WAY “EGNATIA ODOS” , Tunnel Section of Dodoni
Project’s Owner: Ministry of Public Works

ROAD & RAIL NETWORKS

DETAILED DESIGN OF RAILWAY LINE DURRES – TIRANA PUBLIC TRANSPORT TERMINAL (PTT) AND OF THE NEW RAILWAY CONNECTION TO RINAS AIRPORT (TIA) AND FINANCIAL / ECONOMIC APPRAISAL OF THE WHOLE ALBANIAN RAILWAY NETWORK.

​Project’s Contractor: JV RAILCON ALBANIA


CONSTRUCTION OF REMAINING INFRASTRUCTURE WORKS, SUPERSTRUCTURE WORKS, SIGNALING – TELECOMMAND, TELECOMMUNICATIONS AND ELECTROMECHANICAL INSTALLATIONS OF RAILWAY TUNNELS FOR THE NEW RAILWAY LINE “KIATO-RODODAFNI”.

Project’s Contractor: METKA S.A.


E/M STUDIES FOR  PROJECT “EGNATIA ODOS”

Project’s Contractor: J/V LAHMEYER-ELXIS-EGNATIA E/M DESIGNS

E/M STUDIES FOR  PROJECT “EGNATIA ODOS” : Vertical K.O.K 5.
Project’s Owner:  EGNATIA ODOS S.A. – AEGEK SA

E/M STUDIES FOR  PROJECT “EGNATIA ODOS” : Vertical K.OK. 6.AND SEVERAL UNDERGROUND OVERPASSES
Project’s Owner:  EGNATIA ODOS S.A. – AEGEK SA

STUDY TO DEVELOP A NEW RAILWAY LINE KALAMBAKA - KOZANI SECTION CERES - SIATISTA (SECOND PHASE) FROM KM 44 500-54 700 (AD 1104).
Project’s Owner: OSE SA / EDISY SA

FINAL DESIGN FOR THE LIGHTINGOF THE UNDERPAS OF LARISSA RAILWAY STATION OF THE NEW HIGH SPEED RAILWAY LINE ATHENS - THESSALONIKI.
Project’s Contractor: ELXIS ENGINEERING SA

FINAL DESIGN OF THE LIGHTING OF OVERPASSES AND UNDERPASSES OF SECTION THEBES – MOUROUKI (Km sta 99 + 534 KM).
Project’s Contractor: ELXIS ENGINEERING SA

FINAL DESIGN OF THE LIGHTING OF OVERPASS OF THE NEW DOUBLE-TRACK HIGH-SPEED LINE BETWEEN TITHOREA - DOMOKOS (PART FROM SPERHIOS KM sta 39 + 900 to LIANOKLADI).
Project’s Contractor: ELXIS ENGINEERING SA
​​

AIRPORTS

DETAILED STUDY AND SUPERVISION OF SIX UNITS FOR STAFF CATERING AT THE NEW ATHENS INTERNATIONAL AIRPORT "EL VENIZELOS "AT SPATA.
Project’s Contractor: K.I. SARANTOPOULOS

APPLICATION STUDY  OF EUREST INFLIGHT SERVICES HELLAS S.A AT NEW ATHENS INTERNATIONAL AIRPORT "EL VENIZELOS "AT SPATA.
Project’s Contractor:  K.I. SARANTOPOULOS

DETAILED DESING OF E/M INSTALLATIONS FOR THE EXTENSION OF TERMINAL BUILDING AT THE SAMOS STATE AIRPORT.
Project’s Contractor:  Joint Venture, ALTEC SA – OMIROS SA