HYDROELECTRIC

Construction of dam – spillway – power station and appurtenances of Ilarion Hydroelectric project on the river Aliakmon.

Elaboration of detail design and “as built” drawings of the auxiliary mechanical and electrical equipment of the power station and other installations.

A picture containing nature, mountain, grass, outdoor

Description automatically generated

Scope of works:

The elaboration of the application design of the auxiliary electrical equipment comprised the following:

  • supply and installation of auxiliary mechanical equipment
  • supply and installation of auxiliary electrical equipment