INDUSTRIAL BUILDINGS

Integrated Waste Management of the Region of Peloponnese

The project is the largest PPP on waste management in the country.

REGIONS: ARKADIA , LAKONIA, MESSINIA

PROJECT OWNER: TERNA ENERGY SA – CLIENT: ENVIROPLAN SA 

On – going project

A picture containing indoor, blue, subway

Description automatically generatedScope of works:
Final Design – Building Permits
Detailed Design 
As-Built drawings

Integrated Solid Waste Management, Prime Contractor Mission, Samarkand, UZBEKISTAN

CLIENT: ENVIROPLAN SA 

Scope of Works: 

  • Final Design 
  • Detailed Design

Bio-Waste Treatment Unit  – Pieria Region of Central Macedonia 

CLIENT: ENVIROPLAN SA 

Scope of Works: 

  • Final Design
  • Tender Documents

Assignment of special technical consultant’s duties for assisting GAIA OSE SA and OSE SA with the elaboration of studies of electromechanical installations and supervision of construction for housing the Olympic Supply Center and the relocation of OSE’s Piraeus workshop at Thriassio Pedio.

Scope of works:
Final Design 
Technical Consultant 

Τhe scope of the project was the construction of the building facilities and the facilities of the surrounding area for the new rolling stock repair and maintenance workshop of OSE at Thriasio Pedio, which temporally, would be used as warehouses by OEOA – ATHENS 2004 in order to cover the storing needs of the Olympic Games of 2004 in Athens. The project was completed in two main stages:

  1. Building facilities construction in order to be used as warehouses by the organizing committee of the Olympic Games (building construction, of total area 33.379 m2, building construction, of total area 16.309 m2, formation of the surrounding area, about 62.000m2)
  2. Reformation of the electromechanical installations and rearrangement of the spaces for the relocation of OSE’s piraeus workshop in Thriassion Pedio

Construction of packing and distribution center of daily and magazine press.

PROJECT OWNER: DIARXON S.A.

Scope of works:
Final and detail study

New two – Stories Small Industry Building with underground Printing Plant in Patima – Industrial Park of Kalyvia Municipality, Attiki

PROJECT OWNER: GRAPHIC ARTS  – STEFANOS KARIDAKIS S.A.

Scope of works:
Detail design 
Construction Supervision

Detailed Engineering for aNew Industrial unit at Mandra 

PROJECT OWNER: EUNICE WIND S.A.

MEGA DEAL POWER PLANT SHAT AL BASRA 10XGT9E NATURAL GAS / LDO FIRED OPEN CYCLE POWER PLANT 1250 MW. – Project’s Owner: METKA S.A.

A picture containing sky, outdoor, building, tower

Description automatically generatedServices: 
AIR CONDITIONING – HEATING – VENTILATION (HVAC) &
SMOKE / HEAT EXTRACTION STUDIES.

SAMRA POWER STATION – PHASE III ADD ON PROJECT COMBINED CYCLE PROJECT. (2X143 MW Simple Cycle units) – Project’s Owner: METKA S.A.

A picture containing sky, outdoor, building, factory

Description automatically generatedServices: 
AIR CONDITIONING – HEATING – VENTILATION (HVAC) &
SMOKE / HEAT EXTRACTION STUDIES.

REALIZATION OF AN OPEN CYCLE POWER PLANT AT HASSI R’ MEL (WILAYA OF LAGHOUAT) OF A TOTAL POWER OUTPUT OF APPROXIMATELY 300 MW IN SITE CONDITIONS. Project’s Owner: METKA S.A.

A picture containing outdoor, sky, day

Description automatically generated
Services: AIR CONDITIONING – HEATING – VENTILATION (HVAC) & SMOKE / HEAT EXTRACTION STUDIES.HYDRAULIC & FIRE SAFETY STUDIES

REALIZATION OF AN OPEN CYCLE POWER PLANT AT HASSI R’ MEL II (WILAYA OF LAGHOUAT) OF A TOTAL POWER OUTPUT OF APPROXIMATELY 600 MW IN SITE CONDITIONS.

Project’s Owner: METKA S.A.

Services: 

  • AIR CONDITIONING – HEATING – VENTILATION (HVAC) & SMOKE / HEAT EXTRACTION STUDIES.

E/M STUDY AND CONSTRUCTION SUPERVISION OF COMBINED HEAT AND POWER STATION AT THE COMPANY ALUMINUM OF GREECE SA AGIOS NIKOLAOS BEACH DISTOMO, VIOTIA.

Project’s Owner: ALUMINIUM ELLADOS SA

SES AGHIOS DIMITRIOS – UNITS I, II, III AND IV – UPGRADING THE EXISTING ELECTROSTATIC DUST FILTER AND ADD NEW IN THE SAME UNITS.

Project’s Owner: PPC SA

PREPARATION OF FINAL DESIGN – DETAIL STUDY OF SUBSTATIONS OF TRANSMISSION 150KV/20KV AT THE SITES AGIA AND MAKRIHORI IN LARISSA.

Project’s Owner: PPC SA

PRELIMINARY STUDY FOR THE INFRASTRUCTURE AND THE BUILDINGS OF THE NEW UNIT NO5 OF PPC WITH GAZ AT ALIVERI, EVIA

Project’s Owner: CONTEC A.E.

DESIGN OF NEW FACILITIES OF HEAVY ELECTRICAL MACHINE AT SCARAMANGA SHIPYARD

Project’s Owner:  PARALOS TECHINIKI SA

E/M STUDY AND CONSTRUCTION SUPERVISION OF THE NEW SUBSTATION OF THE SYMETAL FACTORY

Project’s Owner:  SYMETAL SA