POWER PLANTS

MEGA DEAL POWER PLANT SHAT AL BASRA 10XGT9E NATURAL GAS / LDO FIRED OPEN CYCLE POWER PLANT 1250 MW. – Project’s Owner: METKA S.A.

A picture containing sky, outdoor, building, tower

Description automatically generatedServices: 

AIR CONDITIONING – HEATING –
VENTILATION (HVAC) &
SMOKE / HEAT EXTRACTION STUDIES.

SAMRA POWER STATION – PHASE III ADD ON PROJECT COMBINED CYCLE PROJECT. (2X143 MW Simple Cycle units) – Project’s Owner: METKA S.A.

A picture containing sky, outdoor, building, factory

Description automatically generatedServices: 

AIR CONDITIONING – HEATING –
VENTILATION (HVAC) &
SMOKE / HEAT EXTRACTION STUDIES.

REALIZATION OF AN OPEN CYCLE POWER PLANT AT HASSI R’ MEL (WILAYA OF LAGHOUAT) OF A TOTAL POWER OUTPUT OF APPROXIMATELY 300 MW IN SITE CONDITIONS. Project’s Owner: METKA S.A.

A picture containing outdoor, sky, day

Description automatically generated
Services: 
AIR CONDITIONING – HEATING – VENTILATION (HVAC) &
SMOKE / HEAT EXTRACTION STUDIES.HYDRAULIC & FIRE SAFETY STUDIES

REALIZATION OF AN OPEN CYCLE POWER PLANT AT HASSI R’ MEL II (WILAYA OF LAGHOUAT) OF A TOTAL POWER OUTPUT OF APPROXIMATELY 600 MW IN SITE CONDITIONS.

Project’s Owner: METKA S.A.

Services: 

  • AIR CONDITIONING – HEATING – VENTILATION (HVAC) & SMOKE / HEAT EXTRACTION STUDIES.

E/M STUDY AND CONSTRUCTION SUPERVISION OF COMBINED HEAT AND POWER STATION AT THE COMPANY ALUMINUM OF GREECE SA AGIOS NIKOLAOS BEACH DISTOMO, VIOTIA.

Project’s Owner: ALUMINIUM ELLADOS SA

SES AGHIOS DIMITRIOS – UNITS I, II, III AND IV – UPGRADING THE EXISTING ELECTROSTATIC DUST FILTER AND ADD NEW IN THE SAME UNITS.

Project’s Owner: PPC SA

PREPARATION OF FINAL DESIGN – DETAIL STUDY OF SUBSTATIONS OF TRANSMISSION 150KV/20KV AT THE SITES AGIA AND MAKRIHORI IN LARISSA.

Project’s Owner: PPC SA

PRELIMINARY STUDY FOR THE INFRASTRUCTURE AND THE BUILDINGS OF THE NEW UNIT NO5 OF PPC WITH GAZ AT ALIVERI, EVIA

Project’s Owner: CONTEC A.E.

DESIGN OF NEW FACILITIES OF HEAVY ELECTRICAL MACHINE AT SCARAMANGA SHIPYARD

Project’s Owner:  PARALOS TECHINIKI SA

E/M STUDY AND CONSTRUCTION SUPERVISION OF THE NEW SUBSTATION OF THE SYMETAL FACTORY

Project’s Owner:  SYMETAL SA